Precision in
Project Management.
EVCresco is a comprehensive Earned Value Management System for organizations that demand rigorous cost and schedule performance analysis, baseline change control, and DCMA-ready governance.
Self-hosted · EIA-748 aligned · Cobra & P6 integrated
Key EVM metrics · Live from Cobra
Built around how EVMS work actually flows.
Instead of bolting EVMS onto a generic PM tool, EVCresco models the artifacts and roles you already use — analysts, CAMs, WPMs, and program leads — and ties everything back to Cobra and P6.
Baseline Change Control
Author, route, and approve BCPs and trends with role-aware electronic signatures, time-phased cost impact, and full audit history.
Variance Analysis
Configurable threshold tripping with directional breach logic. Auto-generated cause/impact/corrective action narratives.
Cobra Integration
Direct Cobra database reads — programs, rates, calc detail, time phasing, CBBL, MR/UB transactions, no spreadsheet bridges.
Primavera P6 Integration
Baseline vs. forecast deltas at the activity level, with target and remaining unit analysis driving BCP and trend schedule impact.
EVMS Compliance
Surveillance test suite aligned to EIA-748 guidelines with audit history and print-ready DCMA submittal output.
AI Project Intelligence
Conversational assistant with tool calling against your live Cobra and P6 data — variance drivers, schedule logic, risk exposure on demand.
See EVCresco against your data.
A 30-minute walkthrough on a representative program scenario — we'll follow up to schedule.