EVCresco
Enterprise Earned Value Management

Precision in
Project Management

EVCresco is a comprehensive Earned Value Management System purpose-built for organizations that demand rigorous cost and schedule performance analysis, baseline change control, and data-driven decision making.

Performance Indices
SPI / CPI
Real-time schedule and cost efficiency tracking
Forecasting
EAC / TCPI
Estimate at completion with forward CPI analysis
Baselines
BAC / VAC
Controlled baseline with variance at completion
Integration
Cobra / P6
Direct Cobra cost and Primavera P6 schedule feeds
Core Capabilities

Everything You Need for EVM Excellence

From variance analysis to risk management, EVCresco provides a unified platform for earned value management that integrates with your existing Cobra and Primavera P6 infrastructure.

Variance Analysis Dashboard

Current and cumulative schedule/cost variance analysis with configurable threshold tripping. Auto-generated Cause/Impact/Corrective Action narratives with rich text editing for CAM review and submission.

BCWS / BCWP / ACWP SPI / CPI Threshold Trips

Baseline Change Proposals

Full lifecycle BCP management with sequential approval routing through CAM, WPM, and role-based approvers. Time-phased cost impact tables, schedule comparison from P6, and WBS field-level change tracking with electronic signatures.

Approval Workflow BAC Impact E-Signatures

Trend Management

EAC-focused trend tracking with approval workflows mirroring the BCP process. Captures EAC impact by control account with time-phased before/after comparison, remaining-unit schedule analysis from P6, and automated notification routing.

EAC Impact Remaining Units Approval Chain

CAM Notebooks

Comprehensive control account notebooks that consolidate S-curve performance charts, CPR tables, variance narratives, BCPs, trends, WADs, WBS dictionary content, and the risk register into a single printable document per CAM.

S-Curve Charts Print-Ready Full Document

Risk Management

Full risk register with configurable likelihood/consequence matrices, auto-calculated risk levels, handling strategies with residual scoring, and cost impact tracking. Site-level defaults seed new projects for consistency.

Risk Matrix Residual Scoring Cost Impact

Work Authorization Documents

Automatically generated WADs from approved BCPs with chronological revision numbering per WBS element. Captures authorized scope, exit criteria, contract reference, BAC before/after, and electronically signed authorization records.

Auto-Generated Revision Tracking Signatures

Project Intelligence

AI-powered conversational assistant that queries your live project data to answer questions about EVM performance, variance drivers, change control status, schedule logic, and risk exposure. Powered by Claude with 28 tool functions that access your Cobra and P6 data in real time.

Local or Cloud AI Tool Calling Live Data

Comprehensive Reporting

Twenty-plus report types covering BAC/EAC impact and detail at CA and WP levels, schedule impact, variance analysis, BCP/trend reviews, CAM notebooks, RAM, labor variance, CBBL log, and the full DoD IPMR (Formats 1, 2, 3, 4, 5, 7) suite. All printable.

WP-Level Detail 20+ Report Types Print-Ready

IPMR Compliance Reporting

Built-in Integrated Program Management Report support for the DoD-required Formats 1 (WBS), 2 (OBS), 3 (Baseline), 4 (Staffing), 5 (Explanations), and 7 (History). Each format includes a print-optimized variant for submittal packages.

DoD Compliant Six Formats Submittal-Ready

Schedule Health & DCMA-14

Automated schedule quality assessment running the DCMA 14-Point Assessment against P6 schedules — logic, leads, lags, hard constraints, high float, negative float, missed tasks, critical path test, and more. Sits alongside a higher-level Schedule Health summary view.

14-Point Assessment Logic Checks Float Analysis

EVMS Compliance Testing

Automated EVMS surveillance test suite that exercises Cobra and P6 data against the EIA-748 guideline set. Captures pass/fail results per test, retains run history for audit, and produces print-ready compliance reports for DCMA or self-surveillance reviews.

EIA-748 Audit History Self-Surveillance

Reserve & Cost Controls

Cumulative Budget Baseline (CBBL) log, Management Reserve and Undistributed Budget transaction tracking, Critical Items / high-dollar register, and labor variance decomposition (rate vs. usage vs. mix) for full cost-side traceability beyond standard variance analysis.

CBBL Log MR / UB Labor Decomposition
Deep Dive

Built for EVM Professionals

Variance Analysis Engine

Configurable threshold tripping with directional breach logic requiring both index delta and dollar magnitude to agree before flagging a variance

Current and cumulative SV/CV drivers at work package level or rolled up by configurable CAWP code fields (C1-C20)

Variance at Completion analysis with BAC vs EAC comparison, TCPI, and TCPI margin per work package

P6 schedule impact integration comparing current forecast to prior forecast and baseline at the activity level

Auto-generated narratives from customizable templates with Cause/Impact/Corrective Action structure

Change Control System

Sequential approval chain routing through CAM, WPM, and configurable role-based approvers with electronic signatures

Time-phased cost impact tables showing before/after/delta by month across current FY, FY+1, FY+2, and future periods

P6 schedule comparison with activity-level start/finish changes, labor hour deltas, and WBS reassignment tracking

WBS dictionary updates with field-level before/after change tracking for title, CAM, WPM, OBS, scope, exit criteria, and contract reference

Automated WAD generation with chronological revision numbering and authorizing signature blocks

Reporting Suite

BAC and EAC impact reports comparing any two Cobra programs to quantify baseline or estimate changes by control account, with WP-level detail variants

Schedule impact reports with P6 activity-level delta analysis supporting both target units (BCPs) and remaining units (trends)

DoD IPMR submittal package — Formats 1 (WBS), 2 (OBS), 3 (Baseline), 4 (Staffing), 5 (Explanations), and 7 (History) with print variants

Schedule Health and DCMA 14-Point assessments scoring P6 logic, leads/lags, constraints, float distribution, and missed tasks

Labor Variance decomposition separating cost variance into rate, usage, and mix components for sharper root-cause analysis

RAM, CBBL log, BCP/trend reviews, and CAM notebooks — printable governance documents covering responsibility assignment, baseline change history, and per-CAM month-end packages

Print-ready across all modules — variance analyses, BCPs, trends, WADs, risk register, CAM notebooks, and WBS dictionary all produce paginated print views

Structure & Governance

Hierarchical WBS management with WBS/CA/WP type classification, Cobra import, CAM/WPM assignment, and OBS mapping

WBS dictionary templates with per-type scope, exit criteria, and contract reference templates loadable into new elements

Organization breakdown structure with hierarchical OBS management and external subcontractor classification

Role-based access control with site admin, project admin, editor, and viewer roles governing every action in the system

Project configuration with Cobra program mapping, P6 baseline/forecast selection, fiscal year settings, and threshold configuration

AI Project Intelligence

Conversational chat interface where project managers and CAMs can ask natural-language questions about project performance, variance drivers, change control status, and risk exposure

28 tool functions across five tool categories: project data, EVM performance, change control (BCPs/trends/WADs), risk management, and P6 schedule analysis — the AI queries your live data, never fabricates

Threshold and variance analysis — ask which control accounts have tripped thresholds, what's driving schedule or cost variance, and how metrics are trending between periods

Risk exposure summaries — get aggregated risk statistics, cost exposure breakdowns, and top risks by cost impact without navigating through multiple screens

Change control status — query BCP and trend details, approval status, WBS impacts, and EAC deltas through conversation instead of drilling through individual records

Schedule logic analysis — ask the AI to find late activities, list milestones, trace driving predecessors, or explain why a key date moved between two P6 schedules without leaving the chat

Per-user conversation history with markdown-rendered responses including formatted tables, code blocks, and structured data — each user maintains their own private chat context

Integration

Connects to Your Infrastructure

EVCresco reads directly from your existing Cobra and Primavera P6 databases, and leverages AI to make your project data conversational.

Cobra Integration

Direct database connection to Cobra for real-time BCWS, BCWP, ACWP, BAC, and EAC data. Time-phased budget and EAC snapshots for BCP and trend impact analysis. Fiscal calendar synchronization for period-accurate reporting.

Primavera P6 Integration

Reads P6 activity schedules for baseline vs forecast comparison. Supports WBS-based and activity-code-based task resolution. Cached delta reports with automatic invalidation when P6 data changes. Target and remaining unit analysis.

Enterprise Platform

Supports both Oracle and SQL Server P6 & Cobra implementations. Multi-level authorization with site and project roles. Notification system for approval routing. Rich text editing with ActionText. Responsive design from desktop to tablet.

AI Intelligence

Powered by local or cloud AI with tool calling. The AI queries your live Cobra and P6 data through specialized functions — it never guesses, only reports what the data says. Per-user conversation history with markdown rendering.

Ready to Transform Your EVM Process?

We'd love to help streamline your project controls organization. Request a demo and we'll show EVCresco against a representative program scenario.